Projects

Cisco Network Staging and Implementation

Ford Motor Company

Ford has been relying on KLA for their various communication needs for over 80 years and KLA has been a blanketed Tier-1 Supplier to Ford since 1994. KLA provides Cisco Network Implementation services for Ford throughout North America including the deployment of switches, routers, access points, controllers, IPTV and IPTel. 

KLA provides the following Network Services for Ford:

  • Day 1 Network Implementation

  • Day 2 Network Support

  • Remote support dispatch services

  • Wireless surveys for both indoor and outdoor including Mesh

KLA has recently completed Cisco network upgrades at 50 Ford sites including World Headquarters, FMCC, Hermosillo, Mexico Assembly, Kentucky Truck Plant and Oakville Assembly Plant in Oakville, Ontario, Canada.

KLA has 15 Network support personnel (CCNA/CCNP) permanently assigned to Ford in Southeast Michigan. Their scope includes network deployment and support at 74 buildings including two data centers. 

Recently, Ford relied on KLA to assist in setting their global standard for wireless surveys, deployments and certification.

 

In-Building Cellular Enhancement

Verizon Wireless

KLA is a National Turnkey Service Provider (TSP) for Verizon Wireless. KLA provides design, installation and commissioning of In-Building and Outdoor Distributed Antenna Systems. 

Recently, KLA was the lead installer for the Verizon – Ford Enhanced In-Building Wireless Coverage Project (EIBC) which included the site survey, design, installation and commissioning of over 90 million square feet in over 60 buildings. 

KLA had recently completed 100 Distributive Antenna Systems (DAS) for Sprint at Ford so it was a natural fit for KLA to be involved with Verizon for their in building enhancement.

At the height of the project, KLA technicians were installing systems at 12 sites simultaneously in 4 States and Canada. Over 1 million feet of coax cable was installed and 1 million feet of fiber optic cable was utilized. The project was completed in just over 6 months with KLA completing installations in 9 States, Canada and Mexico.

 

Fiber Optic Cabling/Infrastructure Upgrade

Marathon Petroleum Corporation

KLA recently completed a robust Sumitomo FutureFLEX Air Blown Fiber installation at the Marathon Petroleum facility in Detroit, Michigan. Spanning several years and multiple projects, KLA upgraded the existing infrastructure and pulled new ABF tube cable across 6 complexes and 9 buildings across the facility. KLA adhered to Marathon's strict safety guidelines while installing the cable both underground and in conduit throughout the complexes. In addition to testing and re-certifying the existing ABF tube cable, KLA installed dozens of fiber junction boxes, pulled over 30,000 feet of new tube cable, and blew in over 150,000 feet of air blown fiber. By using Sumitomo LYNX Splice-On connectors, KLA was able to extend Marathon a 25 year Sumitomo warranty for the tube, fiber and connectors. Through a rigorous documentation process, KLA helped Marathon establish their expectations for test results going forward. KLA is also the trusted contractor for the termination and testing of all types of fiber installed across the Marathon facility.

 

Hospital Network Infrastructure Project

Henry Ford Health System

KLA completed the structured cabling system at the new Henry Ford Hospital, West Bloomfield, Michigan campus. 

The scope of work includes installation of 25 IDF's with 20,000' of backbone fiber cable, 350 WLAN access points and over 6,000 Cat-6 information outlets. This was a very demanding installation and took careful coordination with other trades a as well as maneuvering through a portion of the hospital that was in operation. 

KLA technicians carefully executed the installation in the operating portion to ensure that no dust or debris from the installation could possibly compromise the health of the patients.

KLA worked closely with HFHS to design the system to meet their exacting needs.

 

Data Center/Call Center Build Out

Safe Auto Insurance

KLA completed the infrastructure construction of a new 33 cabinet state-of-the-art Data Center in Somerset, Kentucky.

The scope of work included installation of fiber and copper 10-Gigabit uplinks, structured wiring of 200 seat call center, installation of access control system and installation of fire alarm system, cctv system and Cisco wireless access points.

KLA also provides services at the Safe Auto Corporate Headquarters in Columbus, Ohio.

The scope of work for the headquarters included voice and data construction as well as installation of 22 cabinets. The technicians also completed fiber and copper 10-Gigabit uplinks, wiring of four floors with 10 gig data backbone, installation of Cisco wireless access points throughout the entire facility, basket tray support system and over 500,000 feet of cable.

KLA is also responsible for any and all moves, adds and changes that Safe Auto requires at both locations as well as their call center in South Carolina.